Skip to Main Content
ajax loader animation
ajax loader animation

Savings for Commercial Industrial Customers

Lower your energy use, cut maintenance costs, and boost your bottom line by upgrading to energy-efficient equipment.

Submit an interest form
Sample hero image

About

We provide cash rebates and incentives for energy efficiency projects. This way your business can afford state-of-the art equipment that improves operations and saves energy and money.  
 
This step makes your building more marketable and enhances your brand’s image as a sustainability leader. Plus, it ensures you’re up to code with local laws.  

Back to top

 

Ways to Save

Rebate

Details

Measure

Rebate

Prescriptive Rebate*

Details

Get a fixed incentive rate for installing energy efficient equipment.

Measure

  • - Heating, Ventilation, and Air Conditioning (HVAC)
  • - Refrigeration
  • - Linear Pipe Insulation
  • - Chiller Replacements

Rebate

Custom Rebate*

Details

Install custom projects to get incentives based on the amount of energy (kWh or therms) you save each year.

Measure

  • - Building Management System Upgrades and Controls
  • - Chiller Plant Optimization
  • - Building Envelope
  • - Demand Controlled Ventilation

Back to top

* Rates can be found in the Program Manual

See all incentives

Buildings in Southeast Queens can access an additional $2,000 per kW to cover up to 100% of the installation cost of eligible equipment upgrades. Learn more about the Neighborhood Bonus.

Updates & Deadlines for Measure Incentives

Due to requirements from the New York State Public Service Commission, the following measures will no longer be eligible for incentives starting November 3, 2025, or earlier if funding runs out.

  • Boiler and Furnace - Combination (“Combi”) Boiler and Furnace 
  • Boiler, Furnace and Unit Heater 
  • Low-Flow - Faucet Aerator 
  • Low-Flow - Showerhead 
  • Window – Film

Key Deadlines:

  • Applications must be submitted by November 3, 2025
  • Projects must be installed and ready for post inspection by: December 15, 2025

Existing projects that include these measures must comply with these deadlines.  

Paused Measures

Effective immediately and until further notice, we have paused accepting new applications and issuing Preliminary Incentive Offer Letters (PIOL) for the following prescriptive HVAC control measures:

  • Variable Frequency Drives
  • Adaptive Photonic Controls
  • Advanced RTU Controls
  • Electronically Commutated (EC) Motor – HVAC Blower Fan

Note: If you have submitted a project that includes one of these paused measures and do not have a PIOL, your Business Development Manager will contact you to discuss next steps.

We’ll keep customers informed about future incentive changes through email communications.*

Back to top

Eligibility

Electric Saving Measures

  • Customers with a Con Edison commercial electric account averaging over 100 kW  peak demand on a rolling 12-month basis, excluding multifamily buildings.

Gas Saving Measures

  • Customers with Con Edison commercial gas accounts, except those with a service class of SC-14 or receiving service via a negotiated contract.

Steam Saving Measures

  • Customers that have a Con Edison electric account, an active Con Edison steam service, and are saving both Con Edison electric energy and Con Edison steam energy.

Fuel Oil Savings Measures

  • Customers with an eligible Con Edison electric account that can provide proof of their annual fuel oil usage, proof of purchase, and are saving both Con Edison electric energy and fuel oil.

View the Program Manual for a full list of eligibility requirements

Back to top

Installation Deadlines

Lighting Measures

  • Please complete installation and submit the required paperwork by June 30, 2025.

Non-Lighting Measures: Electric, Steam, and Gas

  • Please complete installation and submit the required paperwork by October 15, 2025.

Please complete installation and submit the required paperwork by November 10, 2025 for the following:

  • Steam Trap (Low-Pressure Space Heating)
  • Cooler/Freezer Door Gasket
  • Cooler/Freezer Strip Curtains
  • Refrigerated Case Night Cover
  • Chiller Tune-Up
  • Boiler Tune-Up
Back to top

Get Started

Step 1

Discover available incentives.

Step 2

Let us know you’re interested.

Step 3

Start the application process.

Step 4

Find a participating contractor.

Back to top

Resources

Tools and Guides

Financing 

  • We’ve partnered with select financial institutions to offer flexible and affordable financing. Interest rates are as low as 0% and your project may qualify for up to 100% financing, with little to no upfront costs. LEARN MORE

Note: Certain exclusions apply. Clean Heat projects are not eligible for this offer.

Back to top

Not sure where to start?

Email us your question or request more information.

Email Us

*Funding is limited and new sales will be Committed on a first come, first served basis. Submitting an application will not automatically secure funding for your project. The project will be considered ‘Committed’ once an NTP is issued. Your Business Development Manager will notify you via e-mail once your project is Committed. If budget runs out ahead of November 3, 2025, the Participating Contractor network will be notified and no new applications will be accepted.

;