Program Tools and Documents
Use these tools to complete your project application and calculate details for prescriptive projects.
Tools
- Building Automation Systems (BAS) Calculator version 26.2
- Building Envelope Tool version 26.0
- Demand Control Ventilation Tool version 26.0
- Display Case Refrigeration Components Tool version 25.0
- Domestic Water Booster Pump Calculator version 26.0
- Electric Measure Tool version 26.0
- Elevator Modernization Estimator version 26.0
- Energy Valve Savings Calculator version 26.0
- Fan Wall Savings Calculator version 26.0
- Fuel Switch version 26.0
- Guest Room EMS Calculator version 26.0
- Heat Recovery/Pump Chiller Savings Calculator version 2.4
- Pipe Insulation Survey version 26.0
Forms
- Scope of Work Change Form – If you need to make any changes to your project after you’ve submitted an application, but before you’ve submitted a completion certificate, please submit this form to your dedicated energy advisor.
- Certificate of Insurance (example)
- W9 (example)
For detailed information about measure requirements, refer to our program manual.
Technical Guidelines
Use our detailed technical guidelines to help you complete your application for projects that include custom measures.
- All Custom Measures
- Building Automation System/Energy Management Systems
- Building Envelope
- Data Center Equipment
- Domestic Water Booster Pump System Guidelines
- Early Replacement
- Extended Life
- Fuel Switching Guide
- Refrigerated Display Cases
- Refrigerator Compressor Rack Systems
- Sample Project Information Template
- Fan Wall Technical Guidelines
- Induction Unit Projects
- Variable Frequency Drive (Variable Speed Drive)
- Equipment Efficiency Derating