Savings for Commercial and Industrial Building Electrification
Receive incentives to cover project costs and save on equipment when upgrading to building electrification technology.
About
Incentives for all other eligible building electrification technologies—including, but not limited to, central air-source heat pump, ductless mini-splits, variable refrigerant flow heat pumps, and air-to-water heat pump water heaters—are available when installed in existing buildings or gut rehabs. Other building electrification technologies installed in new construction projects are not eligible for incentives.
Limited Time Offer
Projects completed by October 1, 2026, may be eligible for a 20% bonus incentive based on the following guidelines:
Eligible Projects
- Active* in C&I EE-E and submitted before June 1, 2026
- Fuel Switch - HVAC
- Space Heating: Full Building Load Electrification
- Space Heating: Phased Load Electrification
- Domestic Hot Water Electrification
Important Deadlines
- Complete installation by October 1, 2026 (Thursday)
- Submit required documents by October 1, 2026 (Thursday)
- Post inspection scheduled and completed by October 15, 2026 (Wednesday)
- Post inspection passed or cured by October 30, 2026 (Friday)
Terms and Conditions
- Total incentive amount cannot exceed 50% of the customer’s project cost for eligible measure(s) and 100% of each measure cost
- Project must satisfy all other Con Edison requirements per the C&I EE-E Program Manual and Building Electrification Technical Guide
- The 20% bonus incentive amount will only be applied to the measures eligible
*Active projects are defined as projects submitted to the program that have yet to be post inspected.
Building Electrification Incentives
|
Measure Category |
Total Available Incentive ($/MMBTU) |
|---|---|
|
Measure Category Space Heating: Full Building Load Electrification |
Total Available Incentive ($/MMBTU) $120 |
|
Measure Category Space Heating: Phased Load Electrification |
Total Available Incentive ($/MMBTU) $70 |
|
Measure Category Domestic Hot Water Electrification |
Total Available Incentive ($/MMBTU) $200 |
Resources
Use these resources to complete your application and manage your project.
Program Manual & Required Documents
- Program Manual
- Program Application (PDF)
- Certificate of Insurance Example (PDF)
- W9 Example (PDF)
- Scope of Work Change Form (PDF)*
*If you need to make any changes to your project after you’ve submitted an application, but before you’ve submitted a completion certificate, please submit this form to your dedicated energy advisor.
Tools, Guides, & Calculators
- Building Electrification Technical Guide
- Infiltration for Buildings at Design Conditions Guide
- Service Adequacy Request Guide (PDF)
- Design Temperature Lookup Tool
- Acceptable Load Calculations Guide
- Domestic Hot Water Calculator and User Guide v 3.5
- Energy Calculations on Hot Water Use and Other Assumptions Guide
- Statewide Clean Heat - Heat Recovery Chiller Calculator v 2.5 and User Guide v 2.5
- Statewide Clean Heat Custom Space Heating Calculator v 4.3 and User Guide v 4.2
Equipment Checklists
- Air Source Heat Pump Checklist v 2025.1
- Air to Water Heat Pump Checklist v 2025.1
- Ground Source Heat Pump Checklist v 2025.1
- Decommissioning Checklist v 2025.3