PowerReady Incentive Dashboard

Get information on current incentive levels and program progress to goal. Details updated monthly. 

Current Incentive Caps

Please note that your eligibility tier provides the maximum incentive amount; your actual incentive will be determined in the Program Agreement (PA) stage, after you have received your energy service ruling. The incentive amount will vary depending on the maximum incentive eligibility level, total site costs, program budgets, and the general competitiveness of the project when compared to other projects.

Level 2 Plug Cost Caps

Incentive Cap for Program Eligible Costs (Customer + Potential Utility Costs; All values shown are “Up to”)

Incentive Tier

Base Cost
Cap

Speed Bonus

Large Project Bonus
(25+ plugs)*

Max Available
Cost Cap

Future Proofing
Bonus

Incentive Tier

Up to 50%

Base Cost
Cap

$5,000/per plug

Speed Bonus

$1,000/per plug

Large Project Bonus
(25+ plugs)*

$1,500/per plug

Max Available
Cost Cap

$7,500/per plug

Future Proofing
Bonus

10% of eligible costs

Incentive Tier

Up to 90%

Base Cost
Cap

$9,000/per plug

Speed Bonus

$1,800/per plug

Large Project Bonus
(25+ plugs)*

$2,700/per plug

Max Available
Cost Cap

$13,500/per plug

Future Proofing
Bonus

10% of eligible costs

Incentive Tier

Up to 100%

Base Cost
Cap

$10,000/per plug

Speed Bonus

$2,000/per plug

Large Project Bonus
(25+ plugs)*

$3,000/per plug**

Max Available
Cost Cap

$15,000/per plug

Future Proofing
Bonus

10% of eligible costs

*Large Project Bonus – Project must be 25 plugs or more, can only be applied to the first 100 plugs.
**The 25-plug minimum is waived for this tier (up to the first 100 plugs).

DCFC kW Cost Caps

Incentive Cap for Program Eligible Costs (Customer + Potential Utility Costs; All values shown are “Up to”)

Incentive Tier

Base Cost Cap

Speed Bonus*

Load Mgmt Bonus**

Max Available Cap

Charger Hub
Path Bonus***

Max Available Cost Cap

Future Proofing Bonus

Incentive Tier

Up to 50%

Base Cost Cap

$400/kW

Speed Bonus*

$50/kW

Load Mgmt Bonus**

$25/kW

Max Available Cap

$475/kW

Charger Hub
Path Bonus***

N/A

Max Available Cost Cap

N/A

Future Proofing Bonus

10% of eligible costs

Incentive Tier

Up to 90%

Base Cost Cap

$720/kW

Speed Bonus*

$90/kW

Load Mgmt Bonus**

$45/kW

Max Available Cap

$855/kW

Charger Hub
Path Bonus***

$225/kW

Max Available Cost Cap

$945/kW

Future Proofing Bonus

10% of eligible costs

Incentive Tier

Up to 100%

Base Cost Cap

$800/kW

Speed Bonus*

$100/kW

Load Mgmt Bonus**

$50/kW

Max Available Cap

$950/kW

Charger Hub
Path Bonus***

$250/kW

Max Available Cost Cap

$1,050/kW

Future Proofing Bonus

10% of eligible costs

*Speed Bonus: If installing a L2 project, your project needs to complete a successful work verification within 4 months of signing the Program Agreement. If installing a DCFC/Mixed plug project, your project needs to be ruled “Service Adequate” and must complete work verification within 6 months of signing the Program Agreement. Cannot be combined with Interconnection bonus.
**Load Management Bonus: Participants must install Hardware Load Management equipment (e.g., disconnect switches, relays, rectifiers, circuit breakers, power cabinets) to qualify for the bonus. DCFC plugs must maintain a minimum output of 50 kW after load reduction. This bonus may be paired with Speed Bonus if service adequate.
***Interconnection Bonus: Service Inadequate/ Public 10+. Must have significant interconnection costs such as new service or block house. Cannot be combined with any other bonus.

Waitlist Status

Waitlist Status

L2 Disadvantaged Community (DAC) waitlist

We are currently working through the waitlist of active projects that applied for the “up to 100%” incentive tier. We are currently not accepting any additional projects for this waitlist.

Waitlist Status

L2 General Program Timed Release

We are currently committing projects up to our regulatory target (approximately 21,000 L2 plugs). We are currently accepting new projects and applications will proceed off the standby list on a monthly basis.

Waitlist Status

DCFC general program waitlist

No waitlist


Plug Pipeline*

 

Installed Complete

Installed Validation

Committed

In Pipeline

Stand-By

Not Yet Applied

2025 Target

Plug Pipeline*

 

All L2 Plugs

Installed Complete

11,110

Installed Validation

2,040

Committed

5,200

In Pipeline

13,250

Stand-By

0

Not Yet Applied

0

2025 Target

21,371

Plug Pipeline*

 

Up to 50%

Installed Complete

5,960

Installed Validation

1,420

Committed

2,820

In Pipeline

6,660

Stand-By

Not Yet Applied

2025 Target

Plug Pipeline*

 

Up to 90%

Installed Complete

2,790

Installed Validation

500

Committed

1,920

In Pipeline

5,780

Stand-By

Not Yet Applied

2025 Target

Plug Pipeline*

 

Up to 100%

Installed Complete

2,340

Installed Validation

110

Committed

280

In Pipeline

130

Stand-By

Not Yet Applied

2025 Target

Plug Pipeline*

 

Mixed Tier

Installed Complete

30

Installed Validation

10

Committed

180

In Pipeline

680

Stand-By

Not Yet Applied

2025 Target


Plug Pipeline*

Installed Complete

Installed Validation

 

Committed

In Pipeline

Stand-By

Not Yet Applied

2025 Target

Plug Pipeline*

All DCFC Plugs

Installed Complete

450

Installed Validation

 

150

Committed

540

In Pipeline

1,680

Stand-By

0

Not Yet Applied

300

2025 Target

3,127

Plug Pipeline*

Up to 50%

Installed Complete

280

Installed Validation

 

80

Committed

80

In Pipeline

110

Stand-By

Not Yet Applied

2025 Target

Plug Pipeline*

Up to 90%

Installed Complete

80

Installed Validation

 

50

Committed

180

In Pipeline

740

Stand-By

Not Yet Applied

2025 Target

Plug Pipeline*

Up to 100%

Installed Complete

70

Installed Validation

 

20

Committed

270

In Pipeline

780

Stand-By

Not Yet Applied

2025 Target

Plug Pipeline*

Mixed Tier

Installed Complete

30

Installed Validation

 

10

Committed

20

In Pipeline

50

Stand-By

Not Yet Applied

2025 Target

Installed includes both completed projects and projects notified as fully installed by participant, but not yet validated by Con Edison.
*Values are rounded to the nearest 10 plugs

Budget Pipeline ($M)

Installed Complete

Installed Validation

Committed*

Estimated in Pipeline**

Not Yet Applied***

2025 Budget

Budget Pipeline ($M)

L2 Funds

Installed Complete

$110.50

Installed Validation

$15.70

Committed*

$46.80

Estimated in Pipeline**

$106.30

Not Yet Applied***

$0.00

2025 Budget

$237.80

Budget Pipeline ($M)

Up to 50%

Installed Complete

$41.90

Installed Validation

$8.50

Committed*

$19.30

Estimated in Pipeline**

$40.70

Not Yet Applied***

2025 Budget

Budget Pipeline ($M)

Up to 90%

Installed Complete

$32.60

Installed Validation

$5.30

Committed*

$21.20

Estimated in Pipeline**

$63.90

Not Yet Applied***

2025 Budget

Budget Pipeline ($M)

Up to 100%

Installed Complete

$35.70

Installed Validation

$1.80

Committed*

$4.00

Estimated in Pipeline**

$1.80

Not Yet Applied***

2025 Budget

Budget Pipeline ($M)

Mixed Tier

Installed Complete

$0.30

Installed Validation

$.010

Committed*

$2.30

Estimated in Pipeline**

$0.00

Not Yet Applied***

2025 Budget


Budget Pipeline ($M)

Installed Complete

Installed Validation

Committed*

Estimated in Pipeline**

Not Yet Applied***

2025 Budget

Budget Pipeline ($M)

DCFC Funds

Installed Complete

$11.40

Installed Validation

$6.60

Committed*

$38.90

Estimated in Pipeline**

$187.40

Not Yet Applied***

$120.90

2025 Budget

$347.20

Budget Pipeline ($M)

Up to 50%

Installed Complete

$4.80

Installed Validation

$1.80

Committed*

$1.50

Estimated in Pipeline**

$4.00

Not Yet Applied***

2025 Budget

Budget Pipeline ($M)

Up to 90%

Installed Complete

$2.70

Installed Validation

$3.20

Committed*

$16.00

Estimated in Pipeline**

$83.30

Not Yet Applied***

2025 Budget

Budget Pipeline ($M)

Up to 100%

Installed Complete

$3.40

Installed Validation

$1.20

Committed*

$19.80

Estimated in Pipeline**

$100.20

Not Yet Applied***

2025 Budget

Budget Pipeline ($M)

Mixed Tier

Installed Complete

$0.50

Installed Validation

$0.30

Committed*

$1.60

Estimated in Pipeline**

$0.00

Not Yet Applied***

2025 Budget

Installed includes all funds that are committed, including projects that are paid out and projects to which Con Edison has committed funds via signed Payment Agreements.
* Funds committed to projects not yet installed are subject to change once incentives are finalized and paid out.
**Estimate of funds it would take to incentivize all plugs in the pipeline, including the wait list, and this value may exceed the program authorized budget.
*** Not yet applied captures the estimated budget available if all applied projects were to be installed. Some applied projects will not move forward so interested participants are encouraged to apply since additional budget may be available.

;