E-Mobility Advisory Services
Help planning your EV project. Free tools and services to understand grid capacity, prepare for the interconnection process, and plan for fleet electrification.
About
E-Mobility Advisory Services can help plan your EV project. We provide free tools and services to understand grid capacity, prepare for the interconnection process, and plan for fleet electrification.
Site Assessment
A site assessment is a free, preliminary review of the utility-side upgrades needed to support your electric vehicle project.
- Minimal Upfront Effort: Request through the PowerReady Portal with only an address and proposed EV charger capacity. A Letter of Authorization (LOA) is needed if the requestor is not the site owner.
- Rapid Turnaround: Results provided within 2 weeks. No need for a site visit.
- Detailed Results Report: Provides a preview of utility-side upgrade requirements and timelines. Identifies existing available capacity, upcoming street protections, and environmental conditions that may impact project execution.
You must register before you can apply. Please follow the Registration Guide and the Site Assessment Guide.
Fleet Review
Fleet Review is a service for medium and heavy-duty fleet operators to understand the feasibility, costs, and trade-offs of converting to an electric fleet. It is a free, in-depth report typically completed in 4-8 weeks.
Key Benefits
- Vehicle Assessment: Evaluate the feasibility of converting to electric based on mileage and usage patterns of vehicles in the current fleet.
- Charging Analysis: Multiple charger installation scenarios to show alternatives and trade-offs.
- Total Cost of Ownership: Estimated costs for all aspects of EV operation, including available incentives and comparisons with existing vehicles.
- Phasing Scenarios: Potential EV conversion schedule, balancing fleet age, charging infrastructure plans, and power upgrades.
Interconnection Guides
Interconnection Guides provide an overview of our typical utility service upgrades, including general scope & design processes, estimated project timelines, and high-level responsibilities for both the customer and Con Edison.
General Interconnection Overview
208V Transformer Installation (coming soon)
460V Transformer Installation (coming soon)
Padmount Transformer Installation (coming soon)
Additional Resources
Hosting Capacity Map
The Hosting Capacity Map provides a high-level, system-wide look at grid capacity constraints in our service territory. It is a great place to start if you’re looking for a site to host EV chargers.
Charging Calculator
The charging calculator helps you estimate utility bill costs and potential savings from managed charging incentive program participation. It is the best way to understand how chargers and charging behaviors will affect your monthly bill.