New Construction Project Incentives
If your new construction project can demonstrate performance beyond the Energy Conservation Construction Code of New York State, you may be eligible for incentives on partial or whole-building measures, including indoor and outdoor lighting; water heating; HVAC and more.
To get started, review the program guide to determine your eligibility and project path.
Commercial & Industrial and Multifamily New Construction Pilot Application
Prescriptive & Tabular Code Compliance Pathway Measure Incentives |
Description |
Eligible Technologies |
Commercial and Industrial Building Incentive Rate |
5+ Unit Multifamily Building Incentive Rate |
Unit |
---|---|---|---|---|---|
Lighting Measures |
Indoor and outdoor lighting |
$40/MMBtu |
$25/MMBtu |
$/annual energy saved |
|
Non-Interactive Measures |
Process loads, plug loads, service water heating, and more |
$80/MMBtu |
$80/MMBtu |
$/annual energy saved |
Whole Building Performance Code Compliance Pathway Measure Incentives |
Description |
Eligible Technologies |
Commercial and Industrial Building Incentive Rate |
5+ Unit Multifamily Building Incentive Rate |
Unit |
---|---|---|---|---|---|
HVAC Measures |
Any HVAC system measures |
$115/MMBtu |
$115/MMBtu |
$/annual energy saved |
|
Envelope Measures |
Insulation, glazing, and more |
$150/MMBtu |
$150/MMBtu |
$/annual energy saved |
|
Lighting Measures |
Indoor and outdoor lighting |
$40/MMBtu |
$25/MMBtu |
$/annual energy saved |
|
Non-Interactive Measures |
Process loads, plug loads, service water heating, and more |
$80/MMBtu |
$80/MMBtu |
$/annual energy saved |
Heat Pump Incentives
Planning to install efficient heating and cooling in your new building? We offer thousands in incentives on state-of-the-art heat pump technology, including ductless mini splits, central air source, geothermal, variable refrigerant flow, and custom solutions.
How to Apply
Please complete the New Construction Pilot Program Application Form (PDF) and email us your application package.
Application Deadline
Project applications need to be submitted by June 30, 2022 and completed by October 31, 2022. A project is considered complete when we’ve received all documents, you’ve installed all measures, and the site is ready for inspection. The incentive payment will occur after the final technical review.
was this information helpful?