Obtenga incentivos para la tecnología de vanguardia de administración de la energía
Los sistemas de administración de energía en tiempo real (RTEM) optimizan el rendimiento energético de sus instalaciones, ahorrándole dinero y haciendo que los ocupantes del edificio estén más cómodos.
For Building Managers
RTEM works with your existing Building Automation System (BAS) and uses additional sensors and advanced analytics to:
- Visualize and manage your energy consumption and equipment performance
- Diagnose faulty equipment systems in real time
- Identify no- and low-cost operational improvements
RTEM systems identify opportunities to:
- Save energy and money
- Improve occupant comfort and productivity
- Reduce maintenance costs and extend equipment life
- Strategically plan capital investments
Incentives |
$/kWh* |
$/therm |
$/Mlb |
---|---|---|---|
Incentives Automated System Optimization |
$/kWh* $0.35 |
$/therm $5.00 |
$/Mlb $80 |
Incentives Fault Detection and Diagnostics systems |
$/kWh* $0.20 |
$/therm $2.50 |
$/Mlb $40 |
Eligibility Requirements
To be eligible, your building must:
- Be a commercial, non-profit, or a multifamily building
- Have an average electric demand of 100kW or consume at least 800,000 kWh per year
- Portfolios and campuses of buildings that can meet the demand or consumption minimum threshold are also eligible
- Have Con Edison gas and/or electric service
- Have not received Con Edison BAS/BMS incentives for the same type of savings optimization
- Comply with all other eligibility criteria in the RTEM Pilot Program Manual (PDF)
To get started, please choose a contractor.
Participating Contractor |
Contact Name |
EMAIL ADDRESS |
---|---|---|
Participating Contractor |
Contact Name Jason Peterson |
EMAIL ADDRESS |
Participating Contractor |
Contact Name Gerri Domenikos |
EMAIL ADDRESS |
Participating Contractor |
Contact Name Javier Aleman |
EMAIL ADDRESS |
Participating Contractor |
Contact Name Beatriz Quinones |
EMAIL ADDRESS |
Participating Contractor |
Contact Name Esther Halpern |
EMAIL ADDRESS |
Participating Contractor |
Contact Name Leon Wurfel |
EMAIL ADDRESS |
Participating Contractor |
Contact Name Jeremiah Siska |
EMAIL ADDRESS |
Participating Contractor |
Contact Name Keith La Rose |
EMAIL ADDRESS |
Participating Contractor |
Contact Name Lisa Rockefeller |
EMAIL ADDRESS |
Participating Contractor |
Contact Name James Armstrong |
EMAIL ADDRESS |
Participating Contractor |
Contact Name Jared Toll |
EMAIL ADDRESS |
Participating Contractor |
Contact Name Jennie King |
EMAIL ADDRESS |
Participating Contractor |
Contact Name Jay Handmer |
EMAIL ADDRESS |
Participating Contractor |
Contact Name Theo Breitenstein |
EMAIL ADDRESS |
Participating Contractor |
Contact Name Trent Hayden |
EMAIL ADDRESS |
Participating Contractor |
Contact Name David Neiburg |
EMAIL ADDRESS |
Participating Contractor |
Contact Name Sarah Parlow |
EMAIL ADDRESS |
Participating Contractor |
Contact Name Tim Stewart |
EMAIL ADDRESS |
Participating Contractor |
Contact Name Stephanie Lanker |
EMAIL ADDRESS |
Participating Contractor |
Contact Name Saurabh Betawadkar |
EMAIL ADDRESS |
Participating Contractor |
Contact Name Alex P. Melathe |
EMAIL ADDRESS |
Participating Contractor |
Contact Name Kevin Schaeffner |
EMAIL ADDRESS |
Participating Contractor |
Contact Name Teghpal Sandhu |
EMAIL ADDRESS |
Participating Contractor |
Contact Name Stan Nabozny |
EMAIL ADDRESS |
Participating Contractor |
Contact Name Ariel Galvez |
EMAIL ADDRESS |
Participating Contractor |
Contact Name Somnath Mane |
EMAIL ADDRESS |
Participating Contractor |
Contact Name Brian Nieves |
EMAIL ADDRESS |
Participating Contractor |
Contact Name Daniel Buchanan |
EMAIL ADDRESS |
Participating Contractor |
Contact Name Chase Coleman |
EMAIL ADDRESS |
Participating Contractor |
Contact Name Devin Feeney |
EMAIL ADDRESS |
Participating Contractor |
Contact Name Gregory Hanson |
EMAIL ADDRESS |
Participating Contractor |
Contact Name Erin Garrity |
EMAIL ADDRESS |
Participating Contractor |
Contact Name Justin Loidolt |
EMAIL ADDRESS |
For Contractors
How It Works
- Apply to RTEM program by submitting your completed RTEM Participating Contractor Application Form (PDF) and Participating Contractor Agreement Form (PDF)
- Provide online RTEM System Demo to Con Edison
- Submit your Project Application Form (PDF) then wait approximately two weeks for a Notice to Proceed from Con Edison
- Install the RTEM system
- Email us your installation completion certificate
- Apply for incentives based on the energy you’ve saved
- Email us your incentive application with trend data that supports your savings claims. Con Edison will pre-review your savings prior to submission if desired
- Con Edison will review your savings calculations and trend data and issue a final incentive award