Incentivos tecnológicos de SmartCharge
Reciba incentivos en efectivo cuando instale tecnologías de gestión de carga elegibles en estaciones de carga comerciales para vehículos eléctricos destinadas a uso público, lugares de trabajo, multifamiliares, industriales y de flotas.
NOTA: Actualmente está en vigor una lista de espera para incentivos. Todos los nuevos proyectos se añadirán a la lista de espera hasta que haya fondos adicionales disponibles.
Incentives
In the chart below, the incentive percentage (%) refers to the amount of customer-side and utility-side costs covered.
|
Incentive |
Tier 1 (only SmartCharge Commercial) |
Tier 2 (Tier 1 + other operating cost support)* |
|---|---|---|
|
Incentive Load Management software |
Tier 1 (only SmartCharge Commercial) up to 90% |
Tier 2 (Tier 1 + other operating cost support)* up to 45% |
|
Incentive DER: battery storage |
Tier 1 (only SmartCharge Commercial) up to 60% |
Tier 2 (Tier 1 + other operating cost support)* up to 30% |
|
Incentive Load limiting hardware |
Tier 1 (only SmartCharge Commercial) up to 60% |
Tier 2 (Tier 1 + other operating cost support)* up to 30% |
*NOTE: Demand Charge Rebate
Eligibility Requirements
Your EV charging site must:
- Participate in the SmartCharge Commercial and/or Demand Charge Rebate program
- Install eligible load management technology capable of balancing, curtailing, or deferring applicant’s EV charging demand on the electric grid
What’s Eligible
- Load Management Software
- Energy Management Systems (Hardware or Software)
- Battery Integrated Charging
- On-site Battery Storage
How to Apply
Apply to determine your eligibility.
Use your existing login for our application portal to complete the online application. Depending on your project, you may be prompted to submit:
- Spec sheets
- Invoices for materials and labor
- Single line diagram of installed equipment
NOTE: An incentives waitlist is now in effect. All new projects will be added to the waitlist until additional funds are available.